El Centro Unit 3 Re-Powering Project, Epc

The scope of work on this project included engineering, fabrication, civil/foundations, cooling tower erection, CTG and STG erection, HRSG’s (2), I&E, structural steel, piping, balance of plant equipment commissioning and performance testing. CPMCA Member: ARB, Inc. – Industrial Group Owner: Imperial Irrigation District Project Location: El Centro

Read more »

El Segundo Energy Center Project

This 550-megawatt, Siemens Flex 10 – 1×1 combined cycle power plant involved civil/foundations, ACC erection, CTG and STG erection, HRSG SCR, air-cooled heat exchanger, GSU (4), gas compressors, I&E, structural steel, piping and balance of plant equipment. CPMCA Member: ARB, Inc. – Industrial Group Owner: NRG Project Location: El Segundo

Read more »

Spectrolab Super Project

The expansion and retrofit of solar cell and panel manufacturing facility included design and constructing a Class 10,000 clean room and 400-ton central plant cooling facility. Replacement of old central plant systems equipment. CPMCA Member: Kinetic Systems, Inc. Owner: Spectrolab Contractor: Kinetic Systems, Inc. Architect: Page Southerland Page LLP Project Location: Sylmar

Read more »

Brea-Olinda Power II

A new facility, consisted of using landfill gas as the gas supply for the combustion turbines, by capturing methane gas from the decaying trash. It was divided into gas collection/conditioning area and the power block area. CPMCA Member: Performance Mechanical, Inc. Engineer: GCC – Venture Engineering; Power Block – Stantec Owner: Brea Power II, LLC… Read more »

Read more »

Chevron Depropanizer Unit

PMI installed foundations, underground piping, a new depropanizer tower, a four-level steel structure, vessels, and pumps. They also installed new 30” Cooling Water piping, supports, and access platforms, and tie-in to basin at an existing cooling tower. CPMCA Member: Performance Mechanical, Inc. Owner: Chevron Products Company Contractor: Foster Wheeler Architect: Foster Wheeler Project Location: El… Read more »

Read more »

Castaic Sports Complex

All Area Plumbing prefabricated 145 sections of piping including the underground as well as installed waste & vent, domestic hot/cold water, storm drain and gas systems in this LEED Silver Certified project. CPMCA Member: All Area Plumbing, Inc. Owner: County of Los Angeles Contractor: Perera Construction & Design, Inc. Architect: Langdon Wilson International Project Location:… Read more »

Read more »

Maintenance Facility

All Area Plumbing laid over 3,000-linear-feet of piping including 76 prefabricated rack piping assemblies and 1 boiler skid as well as chilled/heating hot water. CPMCA Member: All Area Plumbing, Inc. Owner: Major Multinational Corporation Contractor: Airemasters Air Conditioning Architect: WLC Architects, Inc. Project Location: Anaheim

Read more »

Iconic Focal Point

All Area Plumbing installed chilled/heating hot water, waste & vent, domestic/industrial hot water, domestic/industrial cold water, grease waste & vent, beverage waste & vent, reverse osmosis, soft cold water and gas systems. CPMCA Member: All Area Plumbing, Inc. Owner: Major Multinational Corporation Contractor: Bergman Companies Architect: SMS Architects Project Location: Anaheim

Read more »

Madame Tussauds Hollywood

All Area Plumbing worked on the waste & vent, domestic hot/cold water, condensate, natural gas and storm drain systems on this famous 90,834-square-foot, tourist attraction. Owner: Madame Tussauds Hollywood, Inc. Contractor: Morley Construction Company Architect: Jag/Roto Architects Project Location: Hollywood

Read more »

Renaissance Club Sport

All Area Plumbing installed waste & vent, storm drain, domestic hot/cold water, gas, condensate, and industrial water systems in this six-level hotel and health club. CPMCA Member: All Area Plumbing, Inc. Owner: L&O Aliso Viejo LLC Contractor: RD Olson Construction LP Architect: Dahlin Group Project Location: Aliso Viejo

Read more »