Murray Company provided the detailing and 3-D BIM for the plumbing, HVAC/process and on-project systems including water, oil, air, waste, vent, drains, equipment setting and erection. CPMCA Member: Murray Company Mechanical Contractors Owner: Los Angeles World Airports Contractor: Clark/McCarthy, A Joint Venture Architect: Gruen Associates Project Location: Los Angeles
Amtrak Progressive Maintenance Facility
All Area Plumbing installed waste & vent, storm drain, compressed air, nitrogen, domestic cold/hot water, industrial cold water, gas, vacuum piping systems, 95 prefabricated racks and 21,419 linear-feet of pipe. CPMCA Member: All Area Plumbing, Inc. Owner: National Railroad Passenger Corp. Contractor: Kemp Bros Architect: Kling Stubbins Project Location: Los Angeles
LAX Bus Terminal
All Area Plumbing installed domestic hot/cold water, condensate, waste & vent, storm drain, and natural gas systems in this 44,260-square-foot, LEED Silver certified bus terminal at LAX. CPMCA Member: All Area Plumbing, Inc. Owner: Los Angeles World Airports Contractor: Walsh Austin Joint Venture Architect: Anil Verma Associates, Inc. Project Location: Los Angeles
LAX – Tom Bradley International Terminal
All Area Plumbing prefabricated everything using GPS software to layout over 9,354 field points including 1,056 pipe spools, hot/chilled water, glycol and 43,646 linear-feet of pipe. CPMCA Member: All Area Plumbing, Inc. Owner: Los Angeles World Airports Contractor: Walsh Austin Joint Venture Architect: Fentress Architects Project Location: Los Angeles
NASA/Jet Propulsion Laboratory Flight Project Center Building 321
Xcel Mechanical Systems, Inc. performed site utilities, HVAC, plumbing, remodel and upgrade of the central plant. This LEED Gold Certified project is a seven-story, 195,000-square-foot building. CMPCA Member: Xcel Mechanical Systems, Inc. Owner: NASA/JPL Contractor: Swinerton Builders Architect: LPI Project Location: Pasadena
Genesis Solar Project
ARB installed all jigs, erection and alignment of all pylons, assembly, installation and leveling of all 22,000 Solar Collector Elements. Work included assembling all HCE triple joints, field installation of loop piping, header piping and underground utilities. CPMCA Member: ARB, Inc. – Industrial Group Owner: Genesis Solar, LLC Contractor: Blythe Power Constructors Project Location: Riverside… Read more »
Genesis Solar Project
PMI constructed two power blocks for the Genesis 240-megawatt plant, all mechanical and structural steel erections consisting of approximately 100,000 linear-feet of piping, setting/alignment of two 220-megawatt turbines, pipe rack/structural steel, (ASME code stamp work). CPMCA Member: Performance Mechanical, Inc. Owner: Nextera Contractor: PMI Project Location: Blythe
Chevron Analytical Lab
Xcel Mechanical Systems, Inc. installed a fuel laboratory, test facility for Chevron. A solar-to-steam (S.S.) fuel delivery system was used to the test engines. CPMCA Member: Xcel Mechanical Systems, Inc. Owner: Chevron l Contractor: C.C. Layne and Sons Architect: Jacobs Project Location: El Segundo
GWF Tracy
PMI installed 25 cell air-cooled condensers and turbine exhaust duct. The project included approximately 3,042 feet of large-bore pipe, 1,320 feet of small-bore pipe, 1,424 tons of structural steel, 107 tons of platforms, and 170 cubic feet of grout. CPMCA Member: Performance Mechanical, Inc. Owner: GWF Power Systems Contractor: Performance Mechanical, Inc. Architect: PB Power… Read more »
Keahole St7 Conversion
PMI installed two HRSG’s, one steam turbine and generator, ACC unit and all associated piping, valves, pumps and tanks. The project included detailing and fabrication of large and small-bore piping at the PMI Los Angles pipe fabrication shop. CPMCA Member: Performance Mechanical, Inc. Owner: Black & Veatch Contractor: Hawaiian Electric and Light Company Architect: Black… Read more »