P-129 Cogeneration Plant
PMI installed Mercury 50 Solar Turbines, hot water boilers, absorption chillers, centrifugal chiller, heat recovery boilers, 60,000-gallon propane tanks, multiple pumps and associated mechanical equipment/piping.
CPMCA Member: Performance Mechanical, Inc.
Owner: NAVFAC Southwest, Central IPT
Contractor: T. B. Penick & Sons, Inc.
Engineer: RG Vanderweil
Project Location: Twenty-nine Palms