![Maintenance Facility](https://www.cpmca.org/wp-content/uploads/2013/07/Maintenance-Facility-384x398.jpg)
Maintenance Facility
All Area Plumbing laid over 3,000-linear-feet of piping including 76 prefabricated rack piping assemblies and 1 boiler skid as well as chilled/heating hot water.
CPMCA Member: All Area Plumbing, Inc.
Owner: Major Multinational Corporation
Contractor: Airemasters Air Conditioning
Architect: WLC Architects, Inc.
Project Location: Anaheim