Amtrak Progressive Maintenance Facility
All Area Plumbing installed waste & vent, storm drain, compressed air, nitrogen, domestic cold/hot water, industrial cold water, gas, vacuum piping systems, 95 prefabricated racks and 21,419 linear-feet of pipe.
CPMCA Member: All Area Plumbing, Inc.
Owner: National Railroad Passenger Corp.
Contractor: Kemp Bros
Architect: Kling Stubbins
Project Location: Los Angeles