GWF Tracy
PMI installed 25 cell air-cooled condensers and turbine exhaust duct. The project included approximately 3,042 feet of large-bore pipe, 1,320 feet of small-bore pipe, 1,424 tons of structural steel, 107 tons of platforms, and 170 cubic feet of grout.
CPMCA Member: Performance Mechanical, Inc.
Owner: GWF Power Systems
Contractor: Performance Mechanical, Inc.
Architect: PB Power
Project Location: Tracy